Please Enter Your Keyword
Client
  • XPO Logistics
Construction Cost
  • $1,500,000

Oates Associates was engaged to complete building permits and construction documents, including civil and structural design, for the addition of a loading dock. The 170’x80’ dock addition includes 34 new bays with overhead doors, a pre-engineered metal building supported on a complex pile supported foundation and structural slab system, drainage and pavement reconstruction, utility coordination and relocation and building demolition.

Get in touch with us Contact Us
Connect with us on LinkedIn or Instagram