I-55 / 70 & US ROUTE 40 INTERCHANGE
CONSTRUCTION COST: $11,000,000
COMPLETION DATE: 1990 (study)
CLIENT: ILLINOIS DEPARTMENT OF TRANSPORTATION
A severe curve on I-55 at the interchange with heavily
traveled U.S. Route 40, created a dangerous section of highway that
experienced a very high accident rate. Oates Associates was enlisted
to plan the reconstruction of the existing two-directional interchange
to improve safety. The scope of the project included preliminary planning,
a design report and environmental assessment.
The project involved the evaluation of various interchange design
alternatives, preparation of Interchange Design Studies for the selected
alternates, value engineering studies and public meeting and hearing
documents and displays. A full field survey was included, along with
preparation of right-of-way documents.
Environmental impacts studied included socio-economic, agricultural
land, air quality and noise. No significant environmental impacts
were identified.
|