MILL HILL ROAD BRIDGE
CONSTRUCTION COST: $900,000
COMPLETION DATE: 2003
CLIENT: CITY OF COLLINSVILLE
In order to improve safety of this failing structure, Oates was hired to design a bridge replacement. The solution was a three-sided precast concrete structure over Canteen Creek. Construction staging was complicated by the need to install a temporary shoring wall consisting of steel “H” piles and timber lagging.
In addition Bridge Condition Report, Hydraulic Report and complete plans were prepared for the replacement of this structure. Services provided include shop drawing review, construction observation, testing and staking, and field surveys.
|