| |
 |
Alan
J. Goepfert
Education:
Bachelor of Science, Civil Engineering
Southern Illinois University, Edwardsville, 1997
Bachelor of Science, Civil Engineering Technology
Southern Illinois University, Carbondale, 1974
Registration:
Professional Engineer: Illinois
Professional Land Surveyor: Illinois Professional Traffic Operations Engineer, Certified by Transportation Certification Board (ITE Affiliated)
Membership:
Illinois Society of Professional Engineers
Illinois Professional Land Surveyors Association
American Public Works Association
Institute of Transportation Engineers
Transportation Engineering Association of Metropolitan St. Louis
Mr. Goepfert is a firm principal and senior civil engineer for
Oates Associates. He is responsible for the firms municipal
street and storm sewer projects in Illinois. Mr. Goepfert has over
25 years experience in survey planning, design operation and construction of municipal
road projects ranging in complexity from street resurfacing to new
roads on new alignments. He is familiar with the requirements of
federal, state and local funding agencies. Projects currently under
his direction as project manager include:
-
South 59th Street, Belleville, IL Reconstruction and
realignment of 2,300 feet of South 59th Street and
the milling and resurfacing of 1,300 feet of West Main Street including a new at-grade railroad crossing and traffic signals.
-
Governors' Parkway (IL Route 159 to IL Route 143), Edwardsville,
IL - Construct new road along new alignment to provide 2 through-traffic
lanes and a bi-directional left turn lane and traffic signals.
-
45th Street (Wells By Pass), Mt. Vernon, IL - Reconstruction
of 1-mile urban roadway to provide two through traffic lanes and a bi-directional left turn lane.
-
Poplar Street, Highland, IL - Widening and resurfacing of 0.6
miles of existing urban street, including two new roundabout intersections.
-
Goshen Road, Edwardsville, IL Reconstruction of 4,400
feet of urban roadway.
He has significant experience in urban and rural roadway, intersection, traffic signal, storm sewer
and mine reclamation projects. The following jobs were previously completed under his
direction:
-
North Seven Hills Road, O'Fallon, IL - Reconstruction of 6,000
feet of existing road and construction of new storm sewer.
-
Rueck Road, Columbia, IL - Reconstruction of 1.5 miles of rural
and urban roadway.
-
Troxler Avenue & IL Route 160, Highland, IL Reconstruction
of 3,200 feet of existing Troxler Avenue and the widening of 1,400
feet of IL Route 160.
-
Koepfli Lane / Troxler Avenue and Illinois Route 143, Highland,
IL - Reconstruction/realignment of 1.2 miles of urban roadway
with intersection improvement(s), traffic signals, widening/resurfacing
0.9 miles of State Route 143 and widening 0.3 miles of State Route
160.
-
Saxton Walnut Grove & Saxton SM-12, Saline County, IL -
Reclamation of 900 acres at 2 abandoned mine sites.
-
Park Hill Drive Over Laurel Branch, Highland, IL - Construct
new three-sided precast concrete bridge structure.
-
Seven Hills Road, O'Fallon, IL - One mile extension of arterial
highway with new railroad grade separation structure and traffic signals.
-
Greenmount Road (Little Oak Lane), St. Clair County, IL
Reconstruction / Realignment of 2.27 miles of rural roadway
with two intersection improvements, traffic signals and an at-grade
railroad crossing.
-
Southwind Drive, St. Clair Township, IL - Reconstruction of
0.4 miles of rural roadway.
-
Meet the Need, Belleville, IL - Construction of 6 new tennis
courts and parking facilities at Althoff Catholic High School
and reconstruction of existing tennis courts at Belleville West
High School.
-
Chenot Place, St. Clair Township, IL - Reconstruction of six
subdivision streets.
-
Hemlock Street (West Highland By-Pass), Highland, IL - Reconstruction/Extension
of 1,500 feet of urban street including an at-grade railroad crossing.
-
Laurel Branch Storm Sewer Improvements, Highland, IL - Construction
of 3,300 ft. of storm sewer improvements.
-
Old Vincennes Road, O'Fallon Township, IL - Reconstruction/Realignment
of 1.4 miles of urban roadway.
-
Scott Field-Troy Road, St. Clair County, IL - Widening and resurfacing
of 1,400 feet of rural road.
-
North 6th Street, Belleville, IL - Reconstruction of 1,000 feet
of urban street.
-
Sycamore Street, Collinsville, IL - Reconstruction of 1,900
feet of urban street.
-
Pyramid Coal Company, Perry County, IL - Reclamation of 300
acre mine site.
-
Old Collinsville Road Extension, Belleville, IL - Construction
of 2,100 feet of new 3-lane urban highway, traffic signal installation
and modifications and a new at-grade railroad crossing.
-
North Douglas Avenue, Belleville, IL - Reconstruction of 1,300
feet of 2-lane urban street.
-
West Main Street, Belleville, IL - Widening and resurfacing
of 5.9 miles of 5-lane urban highway and traffic signal modifications.
-
West Main Street Stormwater Separation, Belleville, IL - Construction
of 2.5 miles of storm sewer.
-
Interurban Stormwater Separation, Belleville, IL - Construction
of 1.2 miles of storm sewer.
-
West Main at 6th Street Traffic Signals, Belleville, IL - Installation
of new traffic signals and intersection improvements.
-
East Main Street, Belleville, IL - Reconstruction of 0.7 miles
of urban road and construction of new pedestrian crossing signal.
-
Schlueter Road Bridge Replacement, St. Clair County, IL - Construct
new bridge and roadway approaches on rural roadway.
-
Robinson School Road Bridge Replacement, St. Clair County, IL
- Construct new bridge and roadway approaches on rural roadway.
-
Stephen A. Forbes State Park, Marion County, IL - Rehabilitate
existing dam and spillway.
-
Piasa Creek Boat Access, Perry County, IL - Construct new boat ramp, floating boat docks
and resurface parking lot.
-
Westfield Plaza Intersection, Belleville, IL - Widening and
resurfacing of 1,800 feet of roadway and installation of new traffic
signal.
|